E1.20 RDM (Remote Device Management) Protocol Forums  

Go Back   E1.20 RDM (Remote Device Management) Protocol Forums > RDM Developer Forums > RDM Timing Discussion
Register FAQ Community Calendar Today's Posts Search

RDM Timing Discussion Discussion and questions relating to the timing requirements of RDM.

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
Old July 6th, 2009   #4
dangeross
Junior Member
 
Join Date: Feb 2009
Posts: 13
Default

E1.20 - 2006 states in section 3.2.1 Responder Packet Timings "RDM responders shall conform to the timing specified in Table 3-3". Table 3-3 line 1 shows max Receive Break and MAB times as 1S. Later in the same section it is stated "Break timing has been modified from the DMX512 standard. The minimum has been lengthened to allow In-Line devices to decrease this time as they pass the data through".
I would interpret the above to mean that a responder must accept packets meeting the timing requirements of Table 3-3 line 1 even though the maximum time values are greater than the allowed Controller Packet maximums.
As far as measuring the break time if your micro supports edge triggered GPIO interrupts on your UART Rx pin you can enable a rising edge interrupt as soon as the UART detects a break and then measure the time to the rising edge of the DMX/RDM break.
dangeross is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Time between controller packets Dan Scheurell RDM Timing Discussion 1 April 1st, 2007 11:38 PM
Exceeding MAB time Dan Scheurell RDM Timing Discussion 2 March 30th, 2007 08:23 AM


All times are GMT -6. The time now is 02:53 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.